Challenge

This addition to a school was specified to use Rub-R-Wall Air-Vapor Barrier. The biggest Challange for the Masons was the labour intensive installation of peel and stick membranes.

Solution

Our spray application requires minimal labour and is applied in 1/3 of the time it takes their labours to install Peel and stick membranes. This saves contractors time and money.

our service area

We serve the following areas

  • Addison
  • Athens
  • Augusta
  • Balderson
  • Brinston
  • Brockville
  • Burritts Rapids
  • Cardinal
  • Carleton Place
  • Clayton
  • Delta
  • Elgin
  • Elizabethtown
  • Frankville
  • Gananoque
  • Inkerman
  • Iroquois
  • Jasper
  • Johnstown
  • Kemptville
  • Kingston
  • Lanark
  • Lansdowne
  • Lombardy
  • Lyn
  • Lyndhurst
  • Maitland
  • Mallorytown
  • Martintown
  • Mcdonalds Corners
  • Merrickville
  • Mountain
  • Munster
  • Newboro
  • North Augusta
  • Oxford Mills
  • Oxford Station
  • Perth
  • Portland
  • Prescott
  • Rideau Ferry
  • Rockport
  • Smiths Falls
  • South Mountain
  • Spencerville
  • St Andrews West
  • Toledo
  • Upper Canada Village
  • Westport
  • Winchester Springs
Our Locations:

The Foundation Guys Inc.
1294 Algoma Rd
Gloucester, ON K1B 3W8
1-613-702-9139
Service Area
Free Estimate